This functionality is activated in "[[Settings - Main]] - Equipment - Use facility and equipment planning functionality". | This functionality is activated in "[[Settings - Main]] - Equipment - Use facility and equipment planning functionality". | ||
Switching the operating and accounting mode of the system is done in the equipment sections, e.g. "Equipment - [[ | Switching the operating and accounting mode of the system is done in the equipment sections, e.g. "Equipment - [[Communications installations]]". | ||
Possible modes are: | Possible modes are: | ||
* current | * current | ||
* mixed | * mixed | ||
* planning | * planning | ||
By selecting the required mode you will only see objects that meet the specified criteria. For example, in "planning" mode, only the planned objects will be visible, while the existing ones will not be displayed. | |||
When switching between modes, in order to reduce possible errors when adding new objects, the appearance of the system will also change slightly. | |||
[[Файл:2023-06-08_17-07.png|thumb|800px|center]] | |||
[[Файл:2023-06-08_17-08.png|thumb|800px|center]] | |||
[[Файл:2023-06-08_17-12.png|thumb|800px|center]] | |||
When adding/editing various objects - there is an option to mark that this object as planned only. | |||
[[Файл:2023-06-08_17-19.png|thumb|800px|center]] | |||
[[Файл:2023-06-08_17-20.png|thumb|800px|center]] | |||
In the facility lists - planned facilities will be marked separately - with a "P" | |||
[[Файл:2023-06-08_17-24.png|thumb|800px|center]] | |||
Until version 3.17 for objects that are located on the map ''([[Cable lines EN|Cable lines]], [[Communications installations]], Fiber Optical Junction Boxes, Manholes, Poles)'' - The appearance of the planned objects will differ from the standard view. The display will be in grey colours. | |||
[[Файл:2014_10_19_20_18_42.png|thumb|800px|center]] | |||
<span id="anchor_317_64">From version 3.17, planned cable lines on the map are shown as dashed lines and in the same colour as normal cable lines (previously all planned cable lines were shown as continuous grey lines).</span> | |||
[[Файл:2023-06-08_17-52-28.png|thumb|800px|center]] | |||
In [[Switching scheme|Switching scheme]] - the planned objects will also be displayed differently. | |||
[[Файл:2023-06-08_17-57.png|thumb|800px|center]] |
Текущая версия от 14:32, 1 ноября 2024
In ERP "UserSide" it is possible to take into account not only the actual objects, but also those that are planned to be placed.
This functionality is activated in "Settings - Main - Equipment - Use facility and equipment planning functionality".
Switching the operating and accounting mode of the system is done in the equipment sections, e.g. "Equipment - Communications installations". Possible modes are:
- current
- mixed
- planning
By selecting the required mode you will only see objects that meet the specified criteria. For example, in "planning" mode, only the planned objects will be visible, while the existing ones will not be displayed.
When switching between modes, in order to reduce possible errors when adding new objects, the appearance of the system will also change slightly.
When adding/editing various objects - there is an option to mark that this object as planned only.
In the facility lists - planned facilities will be marked separately - with a "P"
Until version 3.17 for objects that are located on the map (Cable lines, Communications installations, Fiber Optical Junction Boxes, Manholes, Poles) - The appearance of the planned objects will differ from the standard view. The display will be in grey colours.
From version 3.17, planned cable lines on the map are shown as dashed lines and in the same colour as normal cable lines (previously all planned cable lines were shown as continuous grey lines).